✅ Top Brands: Haier, Tesla Powerwall, BYD, Enphase, Hiconics, Signergy, Solax Batteries, GoodWe, Sunpower, Fronius Reserva etc
✅ Tailored Solutions: Residential, commercial, and off-grid setups
✅ Expert Installation: SAA Certified Installers and CEC-approved systems
✅ Flexible Supply Options: Delivery Australia-wide or pick-up from multiple locations
✅ Support & Monitoring: Ongoing system health checks and remote monitoring options
Already have solar? Don’t let your excess energy go to waste. Adding a battery like the Tesla Powerwall or stackable Signergy units lets you store daytime power for night use and blackout protection. With compatibility options for most inverters, upgrading is easier than ever—and with energy prices rising, the savings are real and immediate.
If your energy bills are creeping up despite having solar, it might be time to expand. Adding extra panels and upgrading your inverter can dramatically boost generation and reduce grid reliance. Many homeowners in Victoria and NSW have seen payback periods shrink to under 5 years after expansion—especially with smart system design.
From July 2025, the Cheaper Home Batteries Program offers up to 30% off battery installations—whether you're adding to an existing system or starting fresh. STCs now apply to batteries too, and some states offer extra incentives for joining Virtual Power Plants (VPPs). Act now before rebate values drop in the next review cycle.
Is your system underperforming or showing error codes? Older inverters, degraded panels, and lack of monitoring can silently drain your savings. If your system is over 8 years old or you’ve added new appliances, a health check and upgrade could restore efficiency and unlock new rebate eligibility.
Knowledge is power—literally. Adding smart monitoring tools like Wattwatchers or Solar Analytics helps you track usage, spot inefficiencies, and optimise performance. These platforms integrate with most systems and provide real-time insights that can cut bills by up to 20% through smarter energy habits.
💰 To receive a personalised quote tailored to your property, please provide the following details:
📦 If you have an existing PV system:
🔍 A clear photo of your switchboard and smart meter
🔍 A photo of your existing inverter, including the compliance sticker (usually found on either side of the unit)
🔍 If your current system is quite old or not large enough to offset your energy bill, are you considering an upgrade or expansion?
🔍 Full address and email address
🔍 If you're looking to expand, are you eligible for the Solar VIC rebates?
👉 You can check your eligibility here: Solar VIC Rebate Checker
💰 To receive a personalised quote tailored to your property, please provide the following details:
📦 If this is your first time looking to have a PV system:
🔍 A clear photo of your switchboard and smart meter
🔍 Average daily consumption in kWh (can be found on your energy bills, if unsure, please email us a copy of energy bills as well)
🔍 Single or a two storey house? And Type of roof: Metal or tile? A clear picture if possible will be helpful.
🔍 Full address and email address
🔍 If you're looking to have a new Solar PV System, you might be eligible for the Solar VIC rebates.
👉 You can check your eligibility here: Solar VIC Rebate Checker
💰 $6,346 in rebates are for a 20kWh Haier Battery System
📦 What’s Included:
4 x 5 kWh Haier Battery
1 x Hybrid Inverter
Backup Capability (assumed single single-phase in this quote)
Professional Installation by our SAA accredited installer
Price assumes single-storey home with single-phase connection.
For three-phase properties, add ~$2,000 (three-phase wiring & components). If you want more than 1 battery, please request a quote
Assumed that the battery must be installed and commissioned before the end of 2025 to secure current the mentioned STC rebates.
Assumes installation on a fire-rated wall. If not, fireproof backing costs and accessories and installation will attract about $375 extra.
Assumes switchboard has sufficient free poles. If not, sub-board supply and installation will costs between $200 to $500.
To get a formal quote, please email clear photos of:
- Your switchboard
- Your smart meter
- Installation area/wall (from a distance)
Pricing is approximate and subject to change after a site inspection.
💰 Total Cost: approx. $13,300 (after $4,750 in rebates)
📦 What’s Included:
1 x 13.5 kWh Tesla Powerwall 3 Battery
Backup Gateway
Inbuilt-Inverter
Backup Capability (single-phase)
Professional Installation by our SAA accredited installer
Price assumes single-storey home with single-phase connection.
For three-phase properties, add ~$1,000 (three-phase wiring & components). If you want more than 1 battery, please request a quote
Assumed that the battery must be installed and commissioned before the end of 2025 to secure current the mentioned STC rebates.
Assumes installation on a fire-rated wall. If not, fireproof backing costs and accessories and installation will attract about $375 extra.
Assumes switchboard has sufficient free poles. If not, sub-board supply and installation will costs between $200 to $500.
To get a formal quote, please email clear photos of:
- Your switchboard
- Your smart meter
- Installation area/wall (from a distance)
Pricing is approximate and subject to change after a site inspection.
💰 Total Cost: approx. $18,800 (after $5,282 in rebates)
📦 What’s Included:
3 x 5 kWh Enphase IQ 5P Battery
Backup Gateway
Backup Capability (assumed single single-phase in this quote)
Professional Installation by our SAA accredited installer
Price assumes single-storey home with single-phase connection.
For three-phase properties, add ~$2,000 (three-phase wiring & components). If you want more than 1 battery, please request a quote
Assumed that the battery must be installed and commissioned before the end of 2025 to secure current the mentioned STC rebates.
Assumes installation on a fire-rated wall. If not, fireproof backing costs and accessories and installation will attract about $375 extra.
Assumes switchboard has sufficient free poles. If not, sub-board supply and installation will costs between $200 to $500.
To get a formal quote, please email clear photos of:
- Your switchboard
- Your smart meter
- Installation area/wall (from a distance)
Pricing is approximate and subject to change after a site inspection.
💰 Total Cost: approx. $12,000 (after $5,510 in rebates)
📦 What’s Included:
2 x SigEnergy Batteries
BMS (Battery Management System)
Inverter
Full Backup Capability
Professional Installation
Price assumes single-storey home with single-phase connection.
For three-phase properties, add ~$1,500 (three-phase backup gateway & components).
Battery must be installed before the end of 2025 to secure current STC rebates.
Assumes installation on a fire-rated wall. If not, fireproof backing costs +$375.
Assumes switchboard has sufficient free poles. If not, sub-board costs +$200.
To get a formal quote, please email clear photos of:
- Your switchboard
- Your smart meter
- Installation area/wall (from a distance)
Pricing is approximate and subject to change after a site inspection.
💰 Total Cost: approx. $5,000 (after $5,016 in rebates)
📦 What’s Included:
3 x 5 kWh Hienergy Li-ion Hiconics Battery
1 x 6 kW Hiconics Hybrid Inverter and BMU
Backup Capability (assumed single single-phase in this quote)
Professional Installation by our SAA accredited installer
Price assumes single-storey home with single-phase connection.
For three-phase properties, add ~$2,000 (three-phase wiring & components). If you want more than 1 battery, please request a quote
Assumed that the battery must be installed and commissioned before the end of 2025 to secure current the mentioned STC rebates.
Assumes installation on a fire-rated wall. If not, fireproof backing costs and accessories and installation will attract about $375 extra.
Assumes switchboard has sufficient free poles. If not, sub-board supply and installation will costs between $200 to $500.
To get a formal quote, please email clear photos of:
- Your switchboard
- Your smart meter
- Installation area/wall (from a distance)
Pricing is approximate and subject to change after a site inspection.
💰 Total Cost: approx. $14,900 (after $4,864 in rebates)
📦 What’s Included:
1 x Fronius Gen24 Hybrid Inverter (Austrian made)
5 x 27.6 HVM Battery Modules by BYD = 13.8 kWh capacity
Backup Capability
Professional Installation by our SAA accredited installer
Price assumes single-storey home with single-phase connection.
For three-phase properties, add ~$2,500 (three-phase Inverter & components).
Battery must be installed before the end of 2025 to secure current STC rebates.
Assumes installation on a fire-rated wall. If not, fireproof backing costs +$375.
Assumes switchboard has sufficient free poles. If not, sub-board costs +$200.
To get a formal quote, please email clear photos of:
- Your switchboard
- Your smart meter
- Installation area/wall (from a distance)
Pricing is approximate and subject to change after a site inspection.